Volt
SONOFF S41STPB iPlug Gen2 S41s US Socket Matter Over WiFi Smart Plug App & Voice Control Inching Mode Time Schedule Smart Scene
SONOFF S41STPB iPlug Gen2 S41s US Socket Matter Over WiFi Smart Plug App & Voice Control Inching Mode Time Schedule Smart Scene
Couldn't load pickup availability
SPECIFICATIONS
Brand Name: SONOFF
Camera Equipped: No
Casing material: PC V0
Certification: FCC
Color: White
Communication method: Wi-fi
Compatibility: All Compatible
High-concerned chemical: None
Input: AC120V~ 50/60Hz
Max load: 15A/1800W
Model: S41STPB
Model Number: S41STPB
Origin: Mainland China
Product dimension: 50x51.6mm
Specification: US Plug
State of Assembly: Ready-to-Go
Use: others
Working temperature: -10°C~40°C
SONOFF S41STPB iPlug Gen2 S41s US Socket Matter Over WiFi Smart Plug App & Voice Control Inching Mode Time Schedule Smart Scene
iPlug Gen2 S41s is a Type B round Matter Over WiFi smart plug. It integrates seamlessly with Apple Home, Google Home, Alexa and other Matter ecosystems for unified smart home control. Built for safety and reliability, it supports up to 15A/1800W, features a V-0 flame-retardant casing, and endures 10,000 relay cycles. It instantly cuts off high voltage during surges, ensuring protection. Set automate scenes, time schedule tasks, or control it anytime via app or voice, and enjoy local operation with eWeLink LAN Control. It's the ultimate key to a reliable and intelligent living space.

Thoughtful Design

Wide Application
Use it to turn on and off compatible devices that have a mechanical power switch.

Perfectly Compatible with the Matter Ecosystem
With a wider working coverage! S41s supports joining the Matter ecosystem,
you can integrate it into your usual apps,such as Apple Home, Google Home and Alexa.

Works Perfectly with Apple Ecosystem
— Fully Supports Siri, iPhone, iPad and Apple Watch.

Reliable and Safe Guarantee

Smart Timer
The invisible butler allows home appliances to understand time, saving you worry, energy, and ensuring safety.

Auto Start-Stop
Set the humidifier to auto-shutoff after 2 hours of use to prevent dry burning from prolonged operation.

Creating the Perfect Smart Scene
Use with the SONOFF human presence sensor to automatically switch the Christmas lights to a multicolored flashing pattern when someone is present and off when they leave.

Support eWeLink LAN Control
Control the appliances connected to SONOFF plug without a server connection.

Voice Control Frees Your Hands
Make life easier by managing your devices with a simple command.


Quick Use
Two pairing methods are available for you to choose from, the first is to add a device via the eWeLink APP. The second is to add a device via a Matter-compatible app.



Share
